Updated Estimating Workflow: Multiple Scopes and Measure Sheets
An on-demand session for home improvement professionals who want cleaner estimates without rebuilding the same information for every option.
The focus is a practical estimating workflow that uses shared measurements, presents choices side by side, and gives customers a polished proposal.
Why duplicate estimating work happens
Estimates often slow down when a team has to start over for each version. A customer may want a good, better, and best option, or a project may span several surfaces, and re-entering measurements for each version creates extra work and a greater chance of mistakes. The workflow covered here starts from one set of measurements and builds the versions from that shared base, so the proposal stays consistent while the options change.
How the two features work together
Multiple Scopes lets a team build more than one version of an estimate while drawing on the same measurements. Measure Sheets provide the shared measurement foundation underneath those versions. Used together, they are intended to simplify the estimating process, cut down on errors, and produce a more polished customer-facing result.
Checklist: is this workflow a fit for your team?
Use this checklist when deciding whether the workflow fits a job: 1) Are there at least two versions or options to show, such as A/B/C proposals? 2) Does the project involve multiple surfaces or areas that need separate scopes? 3) Are measurements being re-entered instead of reused? 4) Would side-by-side presentation help the customer compare choices without recreating data? 5) Is repetitive manual work slowing the sales team in the field? If several answers are yes, the session is directly relevant.
What the session covers
The session walks through building multiple estimate versions from shared measurements, presenting options side by side without recreating data, reducing time on repetitive tasks, streamlining communication between the sales team and customers, and supporting higher close rates through faster, clearer proposals. Presenters named in the source are Emily Ohara, Senior Product Marketing Manager, and Mahan Karimi, Customer Success Manager.
Copying an estimate versus branching from shared measurements
A useful way to think about the change is the difference between copying an estimate and branching from it. Copying means each version is a separate file or record that can drift apart. Branching from shared measurements means the underlying numbers stay linked, so a correction in one place is less likely to leave another version out of date. That distinction is the core of the workflow: shared inputs first, then versions, then a clear side-by-side presentation.